Task templatesFloor and wall finishes
SW

Floor and wall finishes

Resin kitchen floor, front-of-house tiling and wall finishes.

Floor finishes4 tasks1 hold pointsUsed by 0 packages:
1

No dependency — can start at mobilisation

Progress

100%

Checklist

  • Moisture reading recorded
  • Surface ground and vacuumed
  • Primer applied within the open time

Photo evidence

  • Moisture meter reading2 required

Work cannot be covered up until this hold point is inspected and accepted.

2

Starts after: Substrate preparation

Progress

80%

Checklist

  • Coving formed to 150 mm
  • Falls to gully verified
  • Batch numbers recorded

Photo evidence

  • Coving detail3 required
3

Starts after: Resin kitchen floor

Progress

40%

Checklist

  • Tile layout matches the setting-out plan
  • Grout colour approved
  • Movement joints at thresholds

Photo evidence

  • Tiled area3 required
4

Starts after: Front-of-house tiling

Progress

0%

Checklist

  • Protection boards laid
  • Cleaning regime issued
  • Warranty documents uploaded

Photo evidence

  • Protected floor1 required